China Rural Water and Hydropower. 2015, (1):
39-41.
Knowledge map
 
Save
The transformation of the West Main Canal, a reasonable choice of lining program is to ensure the safe operation and flood control project required the key. In seepage areas, through the channel seepage standard scheme comparison, proposed measures to be taken reasonable seepage; in terms of anti-frost taken place concrete arc toe, polystyrene board insulation measures to reduce the heaving channels destruction; lateral seepage passages in there, take a metal gabion gabion exclusion channel base soil moisture, eliminate quicksand Slope slump of drainage measures. Full account of the frost, slope slump, many unfavorable factors of higher water table, make a comprehensive analysis of the program by comparison, raised local conditions puzzle nursing program. Meanwhile, the canal lining the main technical indicators made a specific request.